UTAC: Variable Temperature Emissions Chamber for HGVs Case Study

Join over 10,000 organisations who’ve used the Growth Hub’s free business support

This brand new vehicle emissions test facility is capable of handling vehicles (up to 60 tonnes of inertia) and 4WD vehicles. The facility can be climatically controlled from -30°C to +50°C and used primarily to test buses, trucks and off-highway vehicles for emissions, fuel and lubricant performance and climatic performance. It is also designed to test electric vehicles to determine energy consumption, range and energy efficiency and to test vehicles using alternative fuels such as hydrogen, LNG and CNG for range, emissions and fuel consumption over a drive cycle.

Funding Stream: Local Growth Fund (LGF)
LGF awarded:
£2.4m
Total project cost: £9.5m
Delivery Partner: UTAC  
Project status: Completed March 2021
Project outputs: This project will enable over 5 jobs and 745m2 commercial floorspace by 2020, as well as a £12.6m GVA increase by 2022
Website: https://www.utac.com/

December 2020

The new college campus opened to students on 14 September 2020 and an official opening ceremony will follow in early 2021. The extensive refurbishment has been a fantastic achievement!

STAY CONNECTED: SIGN UP TO OUR NEWSLETTER

Never miss an opportunity to apply for funding, or attend an event by receiving the latest news and updates straight to your inbox.

Our newsletter drops monthly; to be included, simply add your email address.